In construction, speed and quality often seem like opposing forces. Rushing a job can lead to sloppy results, while meticulous craftsmanship can take time. At CDG, we’ve built a process that delivers both—fast execution and uncompromising quality.
It starts with our structure. Every CDG project includes a dedicated superintendent, client account manager, and on-site crew that is well-versed in OSHA safety standards. Our pre-construction phase is intensive and thorough, ensuring that all materials, permits, and labor are lined up before we break ground.
We also utilize advanced scheduling tools that adapt to live project conditions. If unexpected delays arise—such as weather or material shortages—our system recalculates timelines and reallocates crews automatically. This responsiveness allows us to stay on track even when surprises occur.
One of our most impactful strategies is pre-fabrication. For example, with structural steel, we often pre-cut and pre-assemble components off-site, then install them with precision on-site. This reduces installation time significantly while boosting structural reliability.
Clients choose CDG not just for our timelines, but because they know we won’t sacrifice craftsmanship to meet them. With an on-time completion rate of over 98%, we’ve proven it’s possible to have both.