CDG Steel
Erection LLC
Structural steel erection. Pre-engineered metal buildings. Commercial steel framing. Precision-set, safety-first, on-schedule.
Services Built by CDG Steel Erection
Mill-to-jobsite steel: submittals reviewed, sequenced, and set to AISC tolerances on the day we said we'd be there.
Structural Steel Erection
Wide-flange, HSS, and plate girder erection for commercial, industrial, and institutional structures. AISC-qualified crews.
Pre-Engineered Metal Buildings
Varco Pruden, Butler, Nucor, and Metallic PEMB assemblies. Anchor bolt setting through final torque.
Metal Decking
Composite and form deck installation, puddle welding, shear stud placement, and decking close-up per SDI.
Rebar & Anchor Setting
Epoxy-coated rebar placement, column anchor templates, leveling plates, and grout pack to spec tolerance.
Stair & Rail Ironwork
Egress stair assembly, handrail fabrication and install, ship ladders, roof access, and misc. steel to drawings.
Retrofit & Steel Repair
Column reinforcement, corrosion repair, seismic retrofits, and controlled structural modifications on occupied buildings.
Credentials the steel industry actually recognizes.
Erector Qualifications
- AISC Certified Erector program
- AWS D1.1 welder certifications
- SPRAT / IRATA on specialty crews
- Manufacturer-authorized (VP, Butler, Nucor)
Safety & Compliance
- OSHA 30 field leadership
- Written fall-protection program
- Crane signal & rigger certs
- Pre-task planning on every pick
Coordination-Ready
- Tekla & Revit-compatible submittals
- BIM clash-detection participation
- Detailed erection sequencing
- RFI discipline on every drawing revision
From shop drawing to final torque.
Three phases with zero-drama transitions. The steel lands on schedule and stands to spec.
Submittals & Sequencing
Shop drawings reviewed, erection sequence locked, crane picks planned, and anchor bolt templates verified before steel rolls onto the site.
Erection
Sequenced steel placement, plumbing and bolting to AISC tolerances, deck install, and daily safety audits through topping out.
Punch & Turnover
Final torque verification, weld inspection logs, erection tolerance report, and clean turnover to the GC or owner.
Precision. Schedule. Safety.
Precision
Anchor bolt checks with total station. Plumbing tolerances verified daily. No "we'll shim it later" on the handoff.
Schedule integrity
Sequenced crane picks, pre-staged deck, and pre-ordered bolts. Your topping-out date stays the date we promised.
Safety-first
100% tied off. Pre-task planning before every lift. Safety audits daily. Zero recordables โ the hardest number to fake.
Results that speak for themselves.
“Set steel for a 60-ton wide-flange package one bay at a time, in sequence, on the day promised. That's what I want in a steel sub.”
“PEMB assembly came in clean โ anchor bolts dead on, erection tolerance report pre-filled. Zero punch list from my inspector.”
“Tight site with three active cranes. CDG ran their picks around ours without incident and never stole a pour day.”
Part of the CDG Development, Inc. family.
Let's sequence it.
Send drawings and schedule. We'll return a bid, a lift plan, and a realistic topping-out date.
Request a Bid โ